Project location
St Helier, Guernsey
Eurosafe client
R G Falla Ltd
Main Contractor
R G Falla Ltd
Project client
Credit Suisse (Guernsey) Ltd
Contract Duration
Project Brief
Upon conducting a site survey, it was found that the roof was a very complicated roof set up and an orthodox installation was not possible due to the loads that would be placed upon the roof in the event of a fall.
The Solution
Eurosafe Solutions Ltd worked closely with the resident engineers to provide a
fall protection system that would spread the potential loads between the structural steelwork.
Eurosafe Solutions Ltd designed, supplied and installed a series of cable based Latchways fall protection systems. The systems were installed over two phases as the top floor of each building had to be cleared to allow access above the suspended ceilings.