Contract Duration

Project Brief
Upon conducting a site survey, it was found that the roof was a very complicated roof set up and an orthodox installation was not possible due to the loads that would be placed upon the roof in the event of a fall.

The Solution
Eurosafe Solutions Ltd worked closely with the resident engineers to provide a fall protection system that would spread the potential loads between the structural steelwork.

Eurosafe Solutions Ltd designed, supplied and installed a series of cable based Latchways fall protection systems. The systems were installed over two phases as the top floor of each building had to be cleared to allow access above the suspended ceilings.
Video demonstrations
Vacancies
News
21-05: Eurosafe join the Constructionline community...
29-04: Eurosafe appoint new Financial Director...
04-12: Problem Solved at the Greenquarter...
07-10: Eurosafe get "detained" in Gibraltar...
07-10: Eurosafe get CPD Approval from RIBA...
31-08: Eurosafe Solutions in Australia...