Project location Stockport, Cheshire
Eurosafe client Stockport Council
Main Contractor n/a
Project client Stockport Council
Contract Duration As the market hall is fully operational, the installation had to be done out of hours and took 3 weeks to complete. |
_160.jpg) _160.jpg)
_160.jpg) |
Project BriefStockport market hall is a listed building and is prone to frequent repair works. Eurosafe Solutions Ltd had to design and install a bespoke
fall protection and
Suregrip access system.
The SolutionThe initial design was based on drawings but a site survey enabled Eurosafe Solutions Ltd to take detailed measurements to ensure each individual anchor point was made to suit the fixing background.
A fall protection and walkway system was installed to provide full access to all gutters with the minimal visual impact possible.