Contract Duration
As the market hall is fully operational, the installation had to be done out of hours and took 3 weeks to complete.



Project Brief
Stockport market hall is a listed building and is prone to frequent repair works. Eurosafe Solutions Ltd had to design and install a bespoke fall protection and Suregrip access system.

The Solution
The initial design was based on drawings but a site survey enabled Eurosafe Solutions Ltd to take detailed measurements to ensure each individual anchor point was made to suit the fixing background.

A fall protection and walkway system was installed to provide full access to all gutters with the minimal visual impact possible.

Video demonstrations
Vacancies
News
21-05: Eurosafe join the Constructionline community...
29-04: Eurosafe appoint new Financial Director...
04-12: Problem Solved at the Greenquarter...
07-10: Eurosafe get "detained" in Gibraltar...
07-10: Eurosafe get CPD Approval from RIBA...
31-08: Eurosafe Solutions in Australia...