Project Brief
Corus needed fall protection systems installing to their cranes for end user safety when working at height. Owing to the different sizes and specifications of all of their cranes, design calculations were needed to be carried out as each crane had a different requirement.

The Solution
Eurosafe Solutions Ltd designed, supplied and installed a series of bespoke systems to all of the overhead cranes. Over 7000m of cable based systems was installed on 32 cranes and crane tracks. All works were carried out without any disruption to Corus and their 24 hours a day operation.
Video demonstrations
Vacancies
News
21-05: Eurosafe join the Constructionline community...
29-04: Eurosafe appoint new Financial Director...
04-12: Problem Solved at the Greenquarter...
07-10: Eurosafe get "detained" in Gibraltar...
07-10: Eurosafe get CPD Approval from RIBA...
31-08: Eurosafe Solutions in Australia...