Cooper Cameron Ltd
Project location
Leeds, West Yorkshire
Eurosafe client
Cooper Cameron Ltd
Main Contractor
n/a
Project client
Cooper Cameron Ltd
Contract Duration
Works were completed in 4 weeks
Project Brief
Eurosafe Solutions Ltd was asked by Cooper Cameron Ltd to provide an adapted davit arm solution that could be used without interfering with their current testing procedures.
The Solution
The Eurosafe Solutions Ltd davit arm was adapted to allow the end user to work at a high level. This was on top of the pumps used by their off shore oil rigs. Each rig has a variety of pressure testing equipment lowered from above.
Eurosafe Solutions Ltd used a uniform design for the davit arm with a number of adapter kits to enable the end user to attach to a variety of pumps as these pumps varied in design from manufacturer to manufacturer.